Production plans
that keep up
with reality.

SolidERP combines industrial optimization and machine learning to build practical schedules around your machines, materials, teams, and priorities—then recalculates when conditions change.

ScheduleMay 12 — May 18, 2025Day⌄
Work orders
WO-12456Pump housing
WO-12457Valve body
WO-12458Gear shaft
WO-12459Motor bracket
WO-12460End cap
Mon 12Tue 13Wed 14Thu 15Fri 16Sat 17
⚡ disruption
CNC-01
CNC-02
HMC-01
LAT-01
Plan optimizedAll constraints satisfied
Planned Completed⚡ Disruption
30–50%fewer production delays
15–25%higher equipment utilization
20–40%faster schedule generation

Plan around every
real-world constraint.

Model machine capabilities, materials, workforce, maintenance windows, due dates, and business priorities in one living schedule.

Work order WO-24873
OverviewScheduleMaterialsRoutingHistory
Schedule comparison Before (current) After (proposed)
Before
MonTueWedThuFri
CNC-01
CNC-02
LAT-01
WELD-01
ASM-01
After
MonTueWedThuFri
CNC-01
CNC-02
LAT-01
WELD-01
ASM-01

The schedule changes.
The objective doesn’t.

Keep throughput, service levels, and operational priorities aligned.

Deterministic where it matters.
Adaptive where it counts.

SolidEngine combines constraint programming and metaheuristics with an embedded machine-learning layer. It detects operating patterns, tunes solver parameters, and uses historical outcomes as feedback across thousands of connected decisions.

01
Connect

Bring in ERP, MES, and shop-floor data.

02
Configure

Define constraints, objectives, and operating rules.

03
Optimize

Generate a feasible schedule and keep it current.

ERP
MES
Shop floor
SolidEngineHybrid optimization core
ONLINE
01

Constraint systemCapacity, precedence, calendars, skills, materials, policies

02

Objective systemThroughput, service, inventory, utilization, changeovers, cost

Machine LearningPattern detection, adaptive parameter tuning, outcome-based feedback

ADAPTIVE
Schedule

Feasible plan

Fits the systems you already run.

ERPMESShop-floor systemsAPI

Turn planning time into production time.

30–50%fewer production delays
15–25%higher equipment utilization
20–40%faster schedule generation

Results shown reflect outcomes currently presented by Eradevelop.

Make the next schedule
your best one.

Bring us your constraints, priorities, and current planning process. We’ll show you where SolidERP can create leverage.